Why a detailed quote is not a luxury
A quote grouped into two or three lines (“supply + laying”) often hides approximations. Conversely, a quote itemised in 6 to 10 lines protects you against nasty surprises and lets you compare several firms rationally.
CB Sols quotes follow the guidance of DTU 53.12 (the French Unified Technical Document for glued textile and plastic floor coverings), the national reference that frames good laying practice. If a quote makes no reference to the type of substrate to treat, the nature of the removal or the class of levelling compound, there is a risk these subjects are left to chance or charged as extras.
1. Removing the old covering
This is often the most underestimated item. Removal varies with the type of existing covering and its weight: a laminate floor is a heavy waste, more costly per m² to dispose of than a light carpet.
To check in the quote
- Is the type of covering to remove stated (carpet, glued vinyl, laminate, tiles…)?
- Is the area concerned clarified (sometimes different from the area to re-lay)?
- Is waste disposal at the tip included? With a recycling certificate for business projects?
A gap of 4 to 8 €/m² between two quotes on removal often comes from here: one includes everything, the other leaves you to handle disposal.
2. The anti-damp barrier
A mandatory item in certain cases, and too often forgotten in low-end quotes. The anti-damp barrier is required:
- On ground floors that have no anti-damp polythene film under the screed
- Above a crawl space or ventilated cellar
- On any substrate with a residual moisture level above the DTU thresholds
If your future covering is laid without this barrier on a concerned substrate, you risk: carpet lifting, blisters on vinyl, mould under the floor. Outright refusal of the ten-year structural guarantee.
A serious quote explicitly mentions the prior moisture measurement and the application (or not) of an anti-damp bonding primer.
3. The substrate levelling compound
Essential in almost all renovation projects to guarantee a flat substrate. It is what makes the difference between a floor that lasts 15 years and one that shows the substrate’s defects after six months.
The thickness and type of compound vary with the substrate.
P3 compound (standard self-levelling)
6 to 10 €/m² depending on thickness. For concrete substrates with average flatness, no particular constraint.
Fibre-reinforced compound
12 to 30 €/m². Mandatory:
- On a wood substrate (existing wood floor, OSB boards)
- For heavy thicknesses (>10 mm)
- On substrates with micro-cracks
Be wary of quotes that simply skip the compound item: either your substrate is exceptionally flat (rare), or you will pay for the catch-up in after-sales.
4. The supply (material)
The price depends on the type of covering, the manufacturer, the range and, above all, the packaging.
Broadloom carpet
Generally sold in 4 m-wide sheets. The measurement must allow for cutting waste. On narrow spaces, the loss can reach 20%; on large regular areas it falls to 5%.
Carpet tiles
No waste (except border cuts). More expensive per m² but often less loss.
Sheet vinyl
2 m or 4 m-wide packaging.
Vinyl planks or tiles
Waste-free laying, but the setting-out takes more time.
Quantity effect
The larger the area, the less the m² costs (less handling, possible negotiation with the supplier). The same product can vary by 15 to 25% between 30 m² and 300 m².
Our method at CB Sols
We handle receiving the material, checking quantities and colours (manufacturer batch, laying direction). The cutting is done in our workshop where every roll is checked before leaving for the project.
A free, no-obligation quote with a fast reply. Over 28 years of craft near La Rochelle.
5. The laying
The laying price varies with three broad categories of variable.
The covering and its laying method
- Stretched carpet
- Fully glued carpet
- Glued sheet vinyl with welds (heat welds are time-consuming)
- Click vinyl planks
The complexity of the setting-out
- Simple straight laying: standard rate
- Herringbone laying: +15 to 30%
- Special cuts (curves, inlays, bespoke motifs): variable, often by time spent
Project constraints
- Access difficulties (upper floor without a lift, pedestrian access)
- Parking difficulties in a city centre
- Laying in occupied premises or outside working hours
- Small quantities (a flat) cost more per m² than a large project
A serious quote breaks down these variables rather than quoting an opaque “laying” lump sum.
6. Accessories and accessibility
Stair nosings, threshold bars and finishing profiles are items in their own right, often left out of comparisons.
Available materials
- Anodised aluminium: standard, durable, economical
- Brass: high-end finish, ages with a patina
- Brushed stainless steel: industrial look, very resistant
- PVC: economical, but quickly marked
Reduced-mobility accessibility
In public buildings, accessibility requires contrasting stair nosings and tactile studs. It is an item that can represent 5 to 15% of the project on a staircase or a lecture hall. The quote must mention it clearly with compliance to the standards.
How to compare two quotes honestly
Here are the real points to put side by side:
- Area in m² laid and in m² removed, they are not always the same
- Type and class of the planned levelling compound
- Exact reference of the covering (brand, range, batch, usage rating)
- Packaging of the supply (4 m roll, tiles, sheets)
- Laying method (glued, stretched, loose, welds)
- Detailed accessories (stair nosings, threshold bars, skirtings)
- The laying guarantee period, on top of the ten-year structural one
- How cutting losses are calculated
- Travel costs (included or extra)
A 20% gap between two seemingly comparable quotes almost always comes from one of these items. Ask for precision before you sign.
The human factor: a qualified floor-layer
Beyond the price, the question is simple: who lays your floor?
At CB Sols, we are a team of qualified, passionate floor-layers, and we never use a subcontractor. Every project is laid by our own team, supervised by Valentin Prévoteau. This continuity makes the difference on:
- Compliance with the original specification: a subcontractor never reads the quote notes as finely as the person who wrote them
- Keeping to schedule: our teams are not competing with another project
- Clearing snags: we come back on site without passing the buck
A firm that subcontracts can show a lower price: the gap pays the subcontractor and the intermediary margin. Check this point in any consultation: who actually lays the floor?